The BBW02 export cable system consists of a 220kV Export Cable system connecting the Offshore Substation with the Onshore Substation. The route length of the onshore Export Cable is approximately 11km, whereas the offshore Export Cable is 25km. The 220kV Export Cable system ends at the DONG Energy Onshore Substation. A 400kV cable connection is established from the DONG Energy Onshore Substation to the 400kV Bodelwyddan substation of National Grid located approximately 500m away.

Scope of Works

The APS scope related to the civil package of works to be done within and in the immediate vicinity of the Bodelwyddan 400kV National Grid substation and includes the following: