Project Overview

Project is to Design, Supply and Install a twin circuit ducted 132kV Cable system and associated auxiliaries including all jointing, termination and testing for Northern Power Grid. The 23km route runs between West Melton Grid Supply Point and Potteric Carr Bulk Supply Point. A split-point sectionalising arrangement is required on the route in the Denaby Main area. Two 24 fibre optic cables are also be installed, one with each circuit.

Scope of Works

Major Civils - West Melton Potteric Carr – Section 1; to install approx. 9kM twin circuit ducted 132kV Cable system and associated auxiliaries.

This Section is predominantly in the public highway. The works included the full traffic management, excavate, install, backfill and reinstate (in accordance with current HAUC Specifications) 9km twin ducted 132kV Cable system, roping and proving of ducts, installation of fibre optic chambers and subducts. APS has also provide skilled labour as part of the joint bay construction phase.